Release: 5.0 SP4 (Build 5.0.4000.36)
Release Date: July 2007 |
Contents - Issues Resolved by SP4 -
Fixes from Previous Releases - Files Included
with the Patch - Database Upgrade Instructions
- Applying the Patch and Download File -
Upgrade Instructions for SQL Server 2005 and Download File -
Improving Oracle Performance - Using the
Command Line Import Feature |
|
| |
Activity
Details Tabs
· prim41103: Changes are not
committed to database when using Up and Down arrows in activity
details.
After making changes to Activity Details, they are not committed
to the PM database when using the Up or Down arrow keys to move
to another activity.
|
| |
Baselines
· prim20369: Baseline data for
activities does not display after changing Activity IDs and inserting
new activities in the current project.
After creating a baseline for a project, if you change activity
IDs in the project and add new activities (that are not in the baseline)
to the project, baseline data does not appear for the changed activities.
· prim40252:
Cannot edit EPS activity code values in the columns for a restored
baseline project.
There are several issues related to editing baseline projects:
|
| |
|
- You cannot edit EPS activity code
values in the columns of a restored baseline project.
- When opening and project and a restored baseline
project, you can edit only the EPS activity code values in the column
of the current project.
- When opening a restored baseline project, the
EPS activity code values appear only in the Codes tab of the Activity
Details form.
|
| |
·
prim46611: Baseline fields do not display correctly in different
views of Project Management after refreshing the data (i.e., pressing
F5).
When a project is open (and should display live data), baseline
fields do not display correctly after refreshing the data.
|
| |
Calendar Display
· prim31119: Why are weekends
not shaded in the Gantt Chart Week/Day timescales, as they were
in previous versions of Project Management?
With the default global calendar set to a typical 5-day workweek,
Saturdays and Sundays (which are listed as non-work days) are not
shaded.
|
| |
Copy/Paste
· prim47454: When copying/pasting
projects with interproject relationships, if the option “Only
between copied activities” is not selected, it then creates
external relationships between the old projects and the new projects
in Project Management 5.0 service pack 3.
When grouped by EPS, external relationships between projects are
created even if the relationship setting for copying and pasting
projects is not “only between copied activities.”
· prim47517:
Copy and paste project setting for relationships “only
between copied activities” does not create interproject relationships
in 5.0 SP3
When grouped by EPS, relationships between projects are not created
if the relationship setting for copying and pasting projects is
“only between copied activities.”
|
| |
Display
· prim46342: After installing
Project Management Service Pack 3, the Navigation bar has changed
color.
The Navigation bar in the Project Management module changes color
after installing Service Pack 3.
|
| |
Enterprise
Project Structure Dialog Box
· prim51087: With 5.0 SP3, the
Enterprise Project Structure menu lists column headings as Project
ID and Project name instead of EPS ID and EPS Name.
On the Enterprise Project Structure dialog box, the column headings
“EPS Project ID” and “EPS Name” are mislabeled
as “Project ID” and “Project Name”.
|
| |
Gantt Chart
· prim13671: Relationship Lines
not being drawn when using filter.
When a filter is applied to activities, relationship lines are not
added, for example, when new activities that include relationships
are added.
·
prim19957: Bar changes position when row height is increased
to 40 and above.
Bars in the Gantt chart do not align properly if row height is 40
or above.; also, the baseline bar might disappear or display in
the wrong place.
|
| |
Layouts
· prim34395: Intermittent AVAA0
errors when changing layouts in Primavera Project Management 5.0.
When changing layouts in the Project Management module, intermittent
AVAA0 (access violation) errors occur.
|
| |
Login Dialog
Box
· prim23218: Fields are cut-off
or missing from Project Management, Methodology Management, and
Portfolio Analysis.
Unable to enter password on the Login screen because the Password
field is either missing or shrunken.
|
| |
MPP Import/Export
· prim46599: FPDBZ-3853-D error
when trying to import Microsoft Project files into Project Management
5.0 SP3.
After installing Primavera 5.0 SP3, cannot import MPP files for
Engineering and Construction.
|
| |
Performance
· prim34528: Performance is
slow when copying a project in 5.0SP1 with admin superuser account.
Performance is very inconsistent when copying a project with an
admin susperuser account.
|
| |
Printing
· prim29901: Event code: GPTWI-2179-9
when printing from Print Preview or File, Print.
When printing from Print Preview or File/Print, the error GPTWI-2179-9
(Invalid window for printing) is displayed if a Gantt chart is one
of the items being printed.
· prim46479:
Print Preview in 5.0 Service Pack 3 does not show the Gantt Chart
when selecting lowercase timescale dates.
Entering lowercase alpha characters in Timescale fields causes the
Gantt chart to not display.
|
| |
Project Architect
· prim48843: Error: “CCF”C-xxxx-x/Cannot
create file “C:\JMc5857Log.txt”. Access is denied. (When
creating a project using Project Architect.)
When creating a project with Project Architect, the message above
is displayed.
|
| |
Reports
· prim28743: Page setup options
are not saved when Report Wizard report is saved.
Page setup options, including custom headers and footers, are not
saved when the Report Wizard report is saved.
·
prim50043: Multiple Byte – report function unable to
insert line break for Asian Character.
Information is missing in reports because there is no word wrap
or automatic line feed for Asian characters.
·
20023711926: Grand totals are not correct on a grouped by
resource report.
When grouping by resources, the grand totals in reports are not
correct.
|
| |
Resources
· prim42323: Resource information
changes when making change to resource assignment.
After applying a global change, if you replace a resource assignment
by editing the Resource Names on the Resources tab, the resource
name of the newly assigned resource is overwritten in the resource
dictionary by the resource name of the resource that was originally
assigned to the activity.
|
| |
Scheduling
· prim43847: Recalculate Resource
Costs is not working correctly via Job Services.
When using Job Services to schedule and Recalculate Resource Costs
is selected, activity resource assignments that are set to Override
are not recalculated based on the Override Price/Unit. The assignments
are recalculated based on the Resource Price/Unit in the Resource
dictionary.
|
| |
Timescale
· prim46023: When formatting
the Timescale, the Timescale Start Date acronyms are grayed out.
With the language set to French or German, Timescale formatting
options are not enabled.
|
| |
Timesheet
Approval
· prim49311: Time approval hangs
at 58%.
When a specific user tries to approve timesheets, the application
freezes at 58%.
|
| |
Undo
· prim41645: Undoing a Resource
delete does not restore all resource information.
Performing an undo to restore a deleted resource does not restore
all resource data, including resource assignments, timesheet actuals,
and resource codes; only the resource itself is restored. Also,
the message “Undo was not successfully completed. Please verify
data” is displayed.
|
| |
XER Import/Export
· prim46089: On XER import a
large Notebook Topic entry is causing the import to take a long
time.
When importing an XER file that includes a large Notebook Topic
entry, the import takes a very long time.
|
|
|
| This service pack includes fixes from previous 5.0
service packs and hot fixes, as described below. For details, refer
to the solution ID in the Primavera Knowledge Base.
|
| |
Activities Reports
·
prim22791: Timescale in report is shown differently
depending on language settings.
· prim45408:
Activities without predecessors appear in Out-of-Sequence activities
list in Schedule Report.
|
| |
Activities Screen
·
prim26799: Out of bounds error when using the Resource
Usage Profile.
· prim27897:
Why doesn't the Activities screen refresh to show new activity code
value assigned?
|
| |
Activities View
·
prim36819: The column headings in the Activities View
do not convert the first time after changing the Set Language option
to another language.
|
| |
Activity Details
Tabs
·
prim27777: Completed activities display total float
values.
|
| |
Activity Leveling
·
prim42448: Leveling not prioritizing the activities
correctly.
|
| |
Activity Relationships
·
prim39670: Cannot edit activity Relationship Lag when
accessing Project Management using the Compression Server.
|
| |
Apply Actuals
·
prim30813: Actual finish date removed from resource
assignment when applying actuals.
|
| |
Baselines
·
prim25287: In a multi-user environment, updated baseline
dates do not display as expected.
· prim26229:
When using multiple filters to update a baseline, the ‘Show
activities that match’ option continuously defaults to "All
selected filters.”.
· prim26249:
Baseline information occasionally disappears from the Activity table
after updating a baseline.
· prim27158:
When updating a baseline for added activities, the baseline data
for the new activities does not display.
· prim33868:
Event code errors generated when updating baselines.
· prim42993:
Incorrect Project Baseline Bar translation for French and German.
|
| |
Calendars - Activity,
Resource, Project
·
prim28845: Deleting a resource calendar sometimes
deletes the resource.
|
| |
Checking Project
Integrity
·
prim32313: 'EPS level' Activity code assignments are
removed by 'Check Project Integrity'.
|
| |
Codes - Project,
Activity, Resource
·
prim28325: Unable to assign some project codes via
columns in the Projects table.
·
prim22793: Activity code assignment filter for “Current
project’s values” does not work when assigning codes
through columns.
·
prim22792: Activity code assignment not working when
assigning values through column.
|
| |
Compression Server
·
prim37407: Compression Server client connection hangs
with status “connecting to database”.
|
| |
Constraints
·
prim31547: Constraint time is set to 8:01am
if a finish constraint is added to a finish milestone.
·
prim29518: Removing the Expected Finish constraint
sets Duration to 0.
|
| |
Copy/Paste
·
prim15837: Copying and pasting WBS elements creates
duplicate activities.
·
prim27579: Project Manager 4.0 provides a non-descriptive
error message when copying and pasting projects that have duplicate
activities.
·
prim27825: Event Code error: AVAA0 displays
and a duplicate project ID is created when copying and pasting a
project.
|
| |
Database Upgrade
Program
·
prim27447: Out of memory error occurs when upgrading
to 5.0.
·
prim27843: Database upgrade fails with error.
·
prim28480, prim28482: Database scripts fail for setup
/upgrade of databases.
|
| |
Database Creation
Scripts - Oracle, SQL, Interbase
·
prim28131: ConfigAsst.exe fails when run against a
German SQL database.
|
| |
Edit - Fill Down,
Select All
·
prim22071: Selecting an EPS node and using Fill Down
on the Data Date incorrectly displays the Planned Start Date.
|
| |
Expedition Links
·
prim27981: Event code error occurs when attempting
to view Contract Management documents.
|
| |
Global Change
·
prim29812: Applying a global change on a set of activities
deleted by another user creates orphaned user defined fields.
|
| |
Job Service - Function
·
prim28461: Running apply actuals through Job Services
locks up the server.
·
prim30831: Error occurs when scheduling a job to run
while another job is running.
|
| |
Language Support
·
prim27472: Cannot create new Oracle or SQL databases,
or install Job Services on Japanese Windows 2003 Server SP1.
|
| |
Layouts
·
prim29782: Changes to row height are lost after hitting
File, Refresh.
·
prim34395: Intermittent AVAA0 errors when changing
layouts in Primavera Project Management 5.0.
|
| |
Leveling
·
prim9574: Activity with “Late as possible”
constraint moved back to the DD after leveling.
|
| |
Licensing
·
prim28300: Error occurs when trying to administer
license with any non-English Regional Setting.
·
prim30855: Incremental license file does not increment
the database with the additional licenses when being loaded into
version 5.0.
|
| |
Methodology Management
Module
·
prim34529: Error: “Table not found: ROLERATE”
when exporting roles from Methodology Management.
|
| |
MPP Import/Export
·
prim23603: Importing an MPP file with no resource
assignments increases the labor units by a factor of 100.
·
prim33393: Material resource assignments spread incorrectly
when imported from MS Project.
·
prim35842: After importing from MS Project, earned
value and performance percent complete are 0.
·
prim37911: WBS summary activities imported from Microsoft
Project showing units multiplied by 100.
|
| |
Notebook Topics
Reports
·
prim31662: Notebook text is cut off Notebook topics
report.
|
| |
Performance
·
prim28133: Poor Performance with Copy/Paste.
·
prim28846: When undoing the deletion of a resource
assignment the undo process takes a long time to complete.
·
prim34653: SQL Server Performance Issues in version
5.0.
·
prim36285: Deleting WBS nodes is slow in Project Management
version 5.0 on MS SQL Server.
·
prim36454: Report Wizard takes over 1 minute to display
the additional subject area screen.
·
prim36682: Performance degradation accessing Time
Approval dialog box from 3.5.1 to 5.0.
·
prim38164: Update Baseline Performance Improvements
in 5.0 Service Pack 2.
·
prim38176: Primavera 5.0 performance issues.
·
prim39537: Why is performance slow when storing period
performance with multiple projects open?
·
prim44025: Summarization of projects takes an inordinately
long time to complete or hangs halfway.
·
prim46750: When logging in, the process hangs at 32%.
·
prim48771: When logging in, the process hangs at 68%.
·
prim42042: When logging in, the process hangs at 98%.
|
| |
Printing
·
prim29811: Communication error occurs when printing.
·
prim29901: Event code: GPTWI-2179-9 when printing
from Print Preview or File, Print.
·
prim30369: Saved JPEG does not look like Print Preview
when copied to Word/Excel.
|
| |
Project
·
prim29427: Errors occur when making a change in the
current project and then opening another project.
·
prim35930: VTRTA-2369-C error opening more than 1000
projects in Project Management module.
|
| |
Project Architect
·
prim27285: Event Code error VTFRN-1430-5 displays
when importing linked base and plug-in methodology containing UDFs
via Project Architect.
·
prim28534: Application Event Code Error: “VQCVD-0692-1”
or “VTDCF-2850-2” when running Project Architect.
·
prim45749: Project Architect Fails with AVAA0-0889-7.
|
| |
Project Manager
- General
·
prim30772: The password textbox does not display as
expected during login.
|
| |
Purging Deletions
·
prim34642: Purge Deletes is not removing data from
tables.
·
prim40426: Error when purging deletes: CLEANUP_LOGICAL_DELETES
Error: ORA20000: ORU10028: line length overflow, limit of 255 chars
per line.
|
| |
P3 Import/Export
·
prim36672: Errors when exporting from Primavera Project
Management 5.0 to P3 format.
|
| |
Reports
·
prim24658: Actual Finish field is incorrect when running
a summary Resource Assignment Report.
·
prim29733: Report columns not aligning for .html output.
·
prim29739: Time distributed reports saved to a .csv
format are not formatted properly.
·
prim32709: Report Editor report changed to Report
Wizard report after upgrading from 3.5.1 to 5.0.
|
| |
Resource Assignments
·
prim31611: Cannot replace resource assignment when
activity is active on a timesheet with no hours assigned.
|
| |
Resource Roles
·
prim36495: Cannot change role because previous role
already has actuals.
|
| |
Risks
·
prim26643: Risks View freezes when Control Tab is
selected.
|
| |
Scheduler
·
prim28848: Access violation errors occur when scheduling
a project.
·
prim29352: Expected finish date ignored when scheduling
if predecessor activity has finish to finish relationship.
·
prim29745: Units for driving resources assigned to
Level of Effort activities are not allocated correctly.
|
| |
Security
·
prim27833: A user with the Global Security option
“Edit Global Reports” unchecked can edit and save a
global report.
·
prim30423: Unable to view global calendars when the
security to edit global calendars is unchecked.
·
prim31737: Cannot log into Project Management after
changing application user's password successfully via dbconfig.
·
prim31245: Unable to modify time periods in User Preferences
despite the Admin Preference settings for "Allow users to specify
the number of work hours for each time period" being enabled
on the Time Periods tab.
·
prim33178: Users can modify the Price/Unit rate on
the Prices tab of the Roles dialog box for any role, even if they
only have view privileges.
|
| |
Setup
·
prim27472: Cannot create new SQL database on Windows
2003 Server SP1.
|
| |
Timesheets
·
prim27834: A Resource's Timesheet is not visible in
Time Approval.
·
prim33477: Timesheets set to “RM Approved”
when the option “Project Manager must approve before Resource
Manager” is enabled.
·
prim34905: Timesheet status is RM Approved but activities
are in a state of Not Submitted.
·
prim36195: VTFIO-1023-5 error when trying to print
a timesheet report.
|
| |
Tracking View
·
prim37806: AVAA errors when refreshing (F5) or switching
from roles to resource (or vice versa) in Tracking View if many/all
projects are open.
|
| |
Translation
·
prim30058: Text is not translated in Excel export
wizard.
·
prim35163: Untranslated IDs displayed when regional
settings are Czech.
·
prim41973: Error in the German Translation file (comStrings.de-de)
·
prim45364: Hint Help is only partially in French when
the language has been set to French .
|
| |
Users Dialog Box
·
prim38170: Slow performance accessing the Version
5.0 User Profile.
|
| |
WBS - Detail Tabs
·
prim30803: Child WBS status not changed when project
status changed by cut/paste.
|
| |
XER Import/Export
·
prim16871: Error when importing an XER file with orphaned
User Defined Field records.
·
prim22467: CVRJC-3802-1 event code when importing
an XER file.
·
prim26103: When importing relationships in spreadsheet
(XLS) format, the relationship type sometimes appears blank.
·
prim36825: Activity code values are duplicated after
importing an XER file.
·
prim45874: How to Import XER file using Command line
parameters.
|
| |
XLS Import/Export
·
prim30051: Export Activity Relationships to Excel,
when Regional Settings are set to some European countries, causes
Lag to be multiplied by 100.
·
prim30351: Negative values are not exported to XLS
format.
|
|
|
The installer setup.exe
updates the following files (the default location of each file or
group of files is listed in Green).
It will apply the appropriate files, based on your prior deployment.
|
| |
PM.exe, actions.xml, de-de-h1.dll,
de-de-h2.dll, de-de-h3.dll, fr-fr-h1.dll, fr-fr-h2.dll, fr-fr-h3.dll,
W32MKDE.EXE, W32MKRC.DLL, W32MKSET.DLL, W32MKSET.EXE, W32MKSET.HLP
(C:\Program Files\Primavera\Project
Management)
MM.exe (C:\Program Files\Primavera\Methodology
Management)
PA.exe (C:\Program Files\Primavera\Portfolio
Analysis)
P330XERConvert.exe, XERP330Convert.exe (C:\Program
Files\Common Files\Primavera Common\Convert)
dbconfig.exe, dbcfglib.dll (C:\Program
Files\Primavera\Common\bin and C:\Program Files\Common Files\Primavera
Common\dbconfig depending on your configuration)
BREBootStrap.xml, INTERNAL_PLUGINS.XML (C:\Program
Files\Common Files\Primavera Common\Java)
intgserver.jar, serializer.jar, xalan.jar, xerceslmpl.jar, xml-apis.jar
(C:\Program Files\Common Files\Primavera
Common\Java\lib)
PrmJob.exe, PrmJobSv.exe, PrmJobSvStrings.dll (C:\Program
Files\Common Files\Primavera Common\JobService)
Language files: comCaptions.de-de, comCaptions.en-us, comCaptions.fr-fr,
comCaptions.ja-jp, comCaptions.ru-ru, comCaptions.zh-cn, comCaptions.zh-tw,
comStrings.de-de, comStrings.en-us, comStrings.fr-fr, comStrings.ja-jp,
comStrings.ru-ru, comStrings.zh-cn, comStrings.zh-tw (C:\Program
Files\Common Files\Primavera Common\Languages)
Help menu suggestion files: ru-rusuggest.doc, ru-rusuggest.htm,
ru-rusuggest.txt, ja-jpsuggest.doc, ja-jpsuggest.htm, ja-jpsuggest.txt
(C:\Program Files\Primavera\Common\suggest)
prm-updatebaseline.jar (C:\Program
Files\Primavera\Project Management\Baseline Update)
dbexpsda.dll, DbExpPrC.dll (C:\Windows\System32)
|
|
|
| |
Before Proceeding
- If you have already installed Project Management Module Release
5.0 SP3, you do not need to perform any Primavera database upgrade.
Go to
Applying the Patch.
- If you have not already installed
Project Management Module Release 5.0 SP3, use the following table
to determine how to start your upgrade.
|
|
Step 1 – Upgrading from a Previous Primavera
3.5.x or 4.x Release to the 5.0 Release: |
| |
If you are upgrading from 3.5.x or 4.x to 5.0 SP4,
first do the following to upgrade to the 5.0 base release:
1. Do one of the following, based on your SQL Server configuration:
- If you are running SQL Server on Windows 2003 or XP Professional
with Data Execution Prevention (DEP) turned on, upgrade your Project
Management database to 5.0 using the Automatic Database Upgrade
Wizard (ConfigAsst.exe) that can be found in the \Database directory
on the 5.0 SP1 Remastered release CD 1 disk. Please consult the
Primavera Administrator’s Guide on the Documentation CD for
instructions on Automatic Database Upgrades (Part 4: Page 345).
- If you are not running SQL Server on Windows 2003 or XP Professional
with Data Execution Prevention (DEP) turned on, upgrade your Project
Management database to 5.0 using the Automatic Database Upgrade
Wizard (ConfigAsst.exe) that can be found in the \Database directory
on the 5.0 release CD 1 disk. Please consult the Primavera Administrator’s
Guide on the Documentation CD for instructions on Automatic Database
Upgrades (Part 4: Page 345).
2. Once you complete this step, go to Step
2 – Upgrading Your Project Management Database from a Prior
5.0 Release to the 5.0 SP4 Release.
|
| Step 2 – Upgrading Your
Project Management Database from a Prior 5.0 Release to the 5.0 SP4
Release |
| |
To upgrade your database, do the following:
1. Perform a cold backup of your current database, and, for an
Oracle database, a full database export.
If you are unsure how to back up your Oracle database, do not proceed
with the upgrade. Contact your database administrator, your database
vendor, or Primavera Systems for assistance in backing up your database
before performing the database upgrade. Also, ensure that you are
familiar with the process of restoring the backup copy of the database
in case you need to do so.
2. Download or copy the database update zip file (50SP4_DBFILES.ZIP),
and extract its contents.
3. Double-click CONFIGASST.EXE to start the wizard.
4. Follow the steps in the wizard to upgrade your database. For
details on using the wizard, see the “Automatic Database Upgrade”
chapter in the Primavera Administrator’s Guide.
5. Verify that the proper schema has been applied. From the Project
Management module, click Help/About Primavera. On the System tab,
scroll down to Components and verify that the schema version is
PMDB,0500.0024.0001.0006.
Note that the Methodology Management database schema is not updated
as part of this service pack. It’s schema version should be
MMDB,0500.0024.0001.0001.
6. Optional: the Project Management module uses Hierarchical queries
during login. If login performance is degraded, after upgrading
your database set the following Oracle initialization parameter
at the database level to improve performance:
_old_connect_by_enabled = TRUE
7. Once you complete this step, go to Applying the Patch.
|
|
Applying the Patch and Download
File [return
to top] |
| |
Before Proceeding
- If you have already installed Project Management Module Release
5.0 SP3, go to Moving
from 5.0 SP3.
- If you have not already installed Project Management Module Release
5.0 SP3, go to Moving
from 5.0 SP2 or Earlier.
|
| |
Moving from 5.0 SP3
Before you begin, verify that the proper schema has already been
applied. From the Project Management module, click Help/About
Primavera. On the System tab,
scroll down to Components and verify
that the schema version is PMDB,0500.0024.0001.0006.
The Methodology Management database schema was not updated as part
of SP3; it’s schema version should be MMDB,0500.0024.0001.0001.
If your schema versions are different, follow the procedures in
Database
Upgrade Instructions, above, before continuing.
If you have already installed Project Management Module Release
5.0 SP3, to update each client workstation, do the following on
every client machine:
1. Close all Primavera client applications.
2. Download or copy the patch zip file 50SP4_INSTALLFILES.ZIP (Download
file here), and extract its contents, which includes the setup.exe
file.
3. Run the setup program and follow the steps presented by the
installation wizard.
|
| |
Moving from 5.0 SP2 or Earlier
If you performed the Database
Upgrade Instructions above, do the following to update each
client workstation and any machines running Primavera Job Service:
1. Close all Primavera client applications and stop the Primavera
Job Service (if it is running) from the Windows
Services dialog box.
2. If Job Service is installed on this machine, move the existing
file PrmJobSv<DB_Alias>.exe
to a backup directory of your choice.
Note: PrmJobSv<DB_Alias>.exe is located in the following
default location: C:\Program Files\Common Files\Primavera Common\JobService
3. Download or copy the patch zip file (50SP4_INSTALLFILES.ZIP),
and extract its contents, which includes the setup.exe file.
4. Run the setup program and follow the steps presented by the
installation wizard.
5. If Job Service is installed on this machine:
a. Make a copy of the following file:
\Primavera Common\JobService\PrmJobSv.exe
(this newly updated file has a version 5.0.2000.14).
b. Rename Copy of PrmJobSv.exe to PrmJobSv<DB_Alias>.exe
(it should use the same name as the file that was moved in step
2).
c. Start the Primavera Job Service (DB_Alias) from the Windows
Services dialog box. To do this, select Primavera Job Service
(DB_Alias), right-click, then choose Start.
|
|
Upgrade Instructions for SQL
Server 2005 and Download File [return
to top] |
| |
To upgrade to SQL Server 2005, download and extract
the database file 50SP4_DBFILES.ZIP (download
file here), then do one of the following, after applying the
patch:
· Moving from SQL 2000 to SQL 2005: If you are moving your
database from SQL Server 2000 to SQL Server 2005, see prim52689
in Primavera’s Knowledge Base for details.
· Creating a SQL 2005 Database: Run ConfigAsst.exe from
the extracted database folder, and see the “Automatically
Installing a SQL Server Database and Loading Application Data”
topic in the Primavera Administrator’s Guide for details.
|
|
|
| |
To improve Oracle performance, after applying the
patch log in to the PMDB database as an administrative user (such
as ADMUSER) and run the following scripts.
* Oracle 9.2 only, run gather_stats.sql to produce more comprehensive
and accurate statistics.
* On any supported level of Oracle, also run querylib.sql to improve
query performance for the Activity code table (ACTVCODE), deleted
data table (REFRDEL), and UDF values.
|
|
Using the Command Line Import
Feature [return
to top] |
| |
To use the Windows command line interface to import
an XER file (see prim45874), do the following:
1. Make a copy or edit the actions.xml file to specify the EPS
you want to import the project to, the layout you want to use, and
the XER file you want to import from.
You can specify more than one import action in a single file, by
including multiple <action> nodes.
The following is a sample actions.xml file that illustrates importing
2 XER files from the same script. All tags must appear in the file;
however, you can leave some tags empty, as noted below. Values in
bold are literal values you must enter
as is. Values in italics are samples that will vary with your configuration. |
| |
|
<actions> |
| |
|
<action> |
| |
|
|
<type>import</type>
<importFormat>XER</importFormat>
<importType>PROJECT</importType>
<importAction>CREATE</importAction>
<importTo>EPS1</importTo>
<importConfiguration>MyConfig1</importConfiguration>
<importFile>c:\somefile1.xer</importFile> |
| |
|
</action>
<action> |
|
| |
|
|
<type>import</type>
<importFormat>XER</importFormat>
<importType>PROJECT</importType>
<importAction>CREATE</importAction>
<importTo>EPS2</importTo>
<importConfiguration>MyConfig2</importConfiguration>
<importFile>c:\somefile2.xer</importFile> |
| |
|
</action> |
|
| |
</actions> |
|
|
| Tag |
Description |
| <type> |
Required. The type of action to take. Currently the only supported
value is import. |
| <importFormat> |
Required. The format being imported. Value must be XER. |
| <importType> |
Required. The type data being imported. Value must be Project. |
| <importAction> |
Required. The action to take while importing. Value must be
CREATE. |
| <importTo> |
Optional. The short name of the EPS element you are importing
to. This name must exist in the destination database. If you
do not provide a name, the default EPS is used. |
| <importConfiguration> |
Optional. The import configuration to use while importing.
This name must exist in the destination database. If you do
not provide a name, the default import configuration is used. |
| <importFile> |
Required. The full path to the XER file you want to import. |
|
| |
| |
1. Close the PM module if it is running.
2. From the Windows command line, or a batch file, or from code, you
can issue
a command in the following form from the folder where PM.EXE is located:
PM.EXE /username=<name>
[/password=<name>]
[/alias=<name>] /actionScript=<path>
[/logfile=<path>]
|
| |
| Parameter |
Description |
| /username=<name> |
Required. The username to log in to the PM module. |
| /password=<name> |
Optional. The password for the username, if there is one for
the username. |
| /alias=<name> |
Optional. The name of an existing destination database alias.
If you do not specify an alias, the most recently accessed alias
is used. |
| /actionScript=<path> |
The full path to the edited actions.xml file. Must include
the file name. |
| /logfile=<path> |
Optional. The full path for creating the log file that contains
processing results. Must include the file name. |
|
| |
For example:
PM.EXE /username=admin
/password=admin /alias=PMDB
/actionScript=c:\somefolder\importprojects.xml /logfile:c:\somefolder\myLog.txt
If any values include spaces, enclose the value in double quotes
(“”). For example:
PM.EXE /username=admin /password=admin /alias=
PMDB /actionScript=”c:\some folder\importprojects.xml”
/logfile=”c:\some folder\myLog.txt”
Processing results are written to the log file, or you can echo
them to the command line interface.
Possible results are:
0 = success
1 = invalid alias
2 = invalid username or password
3 = XML file not found
4 = invalid action type (did not specify CREATE)
5 = insufficient security privileges
6 = failure while processing the import action. Could include invalid
or missing values in the xml file.
214783647 = unhandled exception, including invalid characters
|
| |
Notes:
- If the command does not include all the required parameters,
the PM module opens.
- The import action:
1. Creates only new projects; you cannot update an existing project.
2. Creates multiple projects under the same EPS if there are multiple
projects in an XER file;
you cannot filter out specific projects within an XER file.
3. If you include non-English characters in the XML file, use the
XML encoding attribute to
specify the language, prior to the <actions> tag. For example,
to specify German or French encoding:
<?xml version=”1.0” encoding=”windows-1252”?>
Also, be sure to save the XML file as Unicode.
The following languages are supported by the Project Management
module:
|
| |
| Language |
Start with: |
| French |
1252 |
| German |
1252 |
| Japanese |
SJIS |
| Russian |
1251 |
| Simplified Chinese |
GBK |
| Traditional Chinese |
Big5 |
|
| |
|
| |
Copyright © Primavera 1999-2008. All rights reserved.
|
|